Part of the Scheduling guide. New to the Schedule? Start with How scheduling works in Workyard.
Tell Ask Workyard what you need in plain words. It plans the change for you, and nothing changes until you check it and apply it.
What Ask Workyard can do on the schedule
Add work: put a crew on a project for a day or a run of days.
Change work: move it, change the times, add or remove people, or remove it.
Change lots of work at once: push a crew's day back, or move everyone from one project to another.
Bring in your spreadsheet: attach the day or week plan you already use and it builds the work from it.
Answer questions: who's free, who's double-booked, which jobs are missing a crew.
Open Ask Workyard
Go to Scheduling.
Click Agent at the top right. The Ask Workyard panel opens beside your schedule.
Type what you need in Ask Workyard anything… and click the send arrow, or click one of the Try asking suggestions.
While it works you'll see Working on it… and the steps it's taking. To stop it, click the square stop button where the send arrow was.
For the best results, name the project, the day or dates, the times and the people or team. Give the date for anything past today, like “Friday 27 Nov” rather than “this Friday”. Keep going in the same chat: Ask Workyard remembers what you just did, so “Move that job to Wednesday” works.
How a change goes on the schedule
Ask Workyard never changes your schedule on its own. Whatever you ask for, the change comes back as a proposal for you to check.
Read the proposal. Ask Workyard explains what it's planning and shows a card marked Pending. Each piece of work on the card is tagged New, Change or Delete, with what's changing, like Starts: Nov 24, 7:00 AM → Nov 25, 7:00 AM.
Check the details. Click Review Change (or Review All for more than one) to see everything in a table. Untick anything you don't want.
Accept it. Click Accept. The Apply Changes window shows how much work will be added, changed or deleted.
Choose whether to tell your crew. Tick Notify assignees to let the people on the work know. It's off unless you tick it.
Click Apply Changes. The card changes to Applied. Click View Changes to see what went through.
From request to schedule, including fixing a proposal that got the day wrong.
Applying can't be undone. If something isn't right afterwards, ask Ask Workyard to change it back, or change it on the schedule yourself. Don't want a proposal? Click Dismiss and nothing changes.
Add work
Describe the job, the day and the crew:
“Put Brett's crew on Agave Commons Mixed-Use next Tuesday, 7am to 3pm”
“Sawyer's crew on Birch Falls Monday to Wednesday, 6:30am start”
“Copy the Birch Falls job to next Tuesday”
You say | Ask Workyard sets |
A project name | The project and its geofence |
A day, dates or “next Tuesday” | Start and due date. Several days become one piece of work that spans them. |
Times, like “7am to 3pm” | Start and due time, in the time zone it tells you |
People or a team, like “Brett's crew” | Everyone on that team, or the people you named |
A label you already use | That label |
A title, if you give one | The title. You don't need one. |
Tip: Asked for a team? The proposal lists people, not teams. Open Review Change and check the names under Assignees are the crew you meant before you apply.
Move, reassign or remove work
Rain day, crew swap or a job that's off: say what changed and Ask Workyard finds the work.
“Move the Agave Commons job to Wednesday 25 Nov and take Brett off it”
“Swap John and Luis tomorrow”
“Delete the Agave Commons job on Tuesday”
“Push all of Parker's crew's jobs on Monday 23 Nov back one day”
“Move everyone on Oak St tomorrow over to Elm St”
“Label all of Mike's jobs next week Concrete”
When a request touches lots of work, Ask Workyard says how much it found and anything to watch for before you review it.
Push a crew's day back, then leave one job where it is.
Shared work moves together. If people from another crew are on the same work, they move with it.
Multi-day work moves as a whole. The start and end both shift.
Repeating work changes one day at a time. To change how often it repeats or when it ends, use the schedule.
Put a spreadsheet on the schedule
Already plan the day or week in a spreadsheet? Your sheet doesn't need special columns. Ask Workyard reads your own headings, like “Site”, “Scope of work”, “Kick off” or “Lead hand”.
Click + next to the message box, then Attach a file, and pick your spreadsheet (.xlsx or .csv).
Type what you want, like “Put this day plan on the schedule”, and click the send arrow.
Read the summary. Ask Workyard tells you how many pieces of work it will add, how it matched names, and anything from the sheet it couldn't bring in.
Click Review All, untick any rows you don't want, then accept and apply as usual.
Attach a day plan. Ask Workyard spots work that's already there, then builds it for another day.
Each row becomes one piece of work, linked to the matching project and geofence, with names matched to your team members. A team name or “whole crew” adds everyone on that team. Comments and notes aren't brought in yet; Ask Workyard lists what it left out so you can add it on the schedule.
Tip: Ask Workyard checks for work that's already on the schedule, but look over the day yourself too. If some of it is already there, untick those rows so you don't add it twice.
Ask questions about the schedule
Find gaps and clashes before your crews show up:
To find | Ask |
Who's free | “Find who isn't scheduled for tomorrow” |
Clashes | “Find overlapping shifts next week” or “Who has more than one job on Monday?” |
Gaps before a busy day | “Which jobs next week have no one assigned or no project?” |
Where someone is | “Where's Brett tomorrow?” |
Planned vs worked | “Compare scheduled vs actual hours this week” |
Each answer says which dates and time zone it checked. When it checks who's free, it also looks at approved time off. Answers appear in the chat and don't change what's on your screen; use search, filters and Group by to look at the same work on the schedule.
Ask a question and open the file it sends back.
Your chats and files
Button at the top of the panel | What it does |
Recent Tasks (clock) | Lists your earlier chats, named by what you asked. Click one to pick it up again. |
New Task (pencil) | Starts a fresh chat. |
Artifacts (page) | Files Ask Workyard made for you in this chat. Some answers come back as a file, like a list of people with nothing scheduled. Click the arrow on a file to View or Download it. |
× | Closes the panel. Your chat is kept. |
What Ask Workyard can't do on the schedule yet
Do these on the schedule yourself for now:
Add notes, checklist items or attachments to work
Create new labels, forms, projects or geofences
Change filters, Group by or Sort on your screen
Set colors for projects or customers
Change how often repeating work repeats, or when it ends
Move shared work for only some of the people on it
FAQs
Will my crew be told about changes?
Only if you tick Notify assignees in the Apply Changes window.
Can I undo a change?
No. To reverse it, ask Ask Workyard to change it back (for example, “Delete the job you just added”), or edit the work on the schedule.
Why does Ask Workyard call my chats "Tasks"?
In the Ask Workyard panel, each chat is called a task. Recent Tasks and New Task are about your chats, not work on your schedule.
Which time zone does it use?
Usually the project's. Ask Workyard says which one it used. If you meant another, tell it and it will redo the proposal.
It picked the wrong people or project. What do I do?
Click Dismiss, then say what's wrong, like “Use Finley's crew instead”. It will make a new proposal.
Next:



